Severe noise disruption (5-10 am, Tuesday 30 April 2024)

Posted: Tue, 30th Apr 2024

! Please note: this page has been archived and is no longer maintained. Links may not work and any contact details may no longer be correct.

The lift contractors will be drilling holes in the walls of the lift shaft to install the push buttons on each floor between 5 - 10 am on Tuesday 30 April.  This work is expected to be particularly noisy and will affect each floor in turn.   

The noise disruption is expected to be less severe on the far side of the building from the lift, in Areas 0B, 1B and 2B.  Free sound-cancelling earplugs are also available from the Library Reception Desk.  

 

 

List all current news items